The work is part of the $62.5 million Omega Curves project, which aims to improve safety and reduce collisions on SR-20 by realigning curves on two non-contiguous segments near White Cloud and Lowell Hill, widening shoulders, improving the highway’s sight distance, and adding designated left-turn lanes near Conservation Road and Washington Road. Construction crews are also installing drainage and performing earth work to widen sections of the roadway. The White Cloud blasting work is required to remove hard rock where the new highway alignment is being constructed. Alternate routes are advised to avoid significant delays. Motorists should allow up to 40 minutes of additional travel time when driving through the Lowell Hill and White Cloud construction zones located along a 14-mile stretch of highway between Conservation Road and Lowell Hill. Additional full closures will take place in mid-September. Monday through Friday.Īt the same time, one-way traffic controls remain in place around the clock in the Lowell Hill construction area through mid-August. Motorists are reminded normal one-way traffic controls remain in effect during regular construction activity from 6 a.m. Nevada County – Caltrans is alerting State Route 20 (SR-20) motorists in Nevada County to additional travel delays for blasting work on the Omega Curves safety improvement project.Ĭonstruction crews plan to hold traffic in the White Cloud area for about 30 minutes during blasting operations scheduled between 8 a.m. District: District 3 - Marysville, Amarjeet S.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |